Boiling Spring Lakes experiences flooding several times a year along Holly, Walnut, and Redwood roads. In 2014, a preliminary engineering report was conducted along these roads to determine optimal solutions to reduce flooding in the area. A 2021 stormwater management master plan prioritized this project. When flooding occurs in this area, homes experience flooding for multiple days. Boiling Spring Lakes will use Golden LEAF flood mitigation grant funds to install stormwater infrastructure along the areas of Holly, Walnut, and Redwood roads. Project activities include digging approximately 3,000 linear feet of drainage ditches with the installation of driveway pipes and several spans of reinforced concrete pipe. Households in the project area will benefit from this project.
Any project more than a couple of years old may not reflect current Board priorities.
Please contact a staff member with any questions.
Stay connected with Golden LEAF by signing up for our e-newsletter. You can also follow us on Twitter, Facebook, and LinkedIn.