Holly, Walnut and Redwood Stormwater Project

underline squiggle

Organization:

City of Boiling Spring Lakes

Amount:

250000

Program Area:

Flood Mitigation and Recovery Program

County of Applicant:

Brunswick

Year:

08/04/2022

Description:

Boiling Spring Lakes experiences flooding several times a year along Holly, Walnut, and Redwood roads. In 2014, a preliminary engineering report was conducted along these roads to determine optimal solutions to reduce flooding in the area. A 2021 stormwater management master plan prioritized this project. When flooding occurs in this area, homes experience flooding for multiple days. Boiling Spring Lakes will use Golden LEAF flood mitigation grant funds to install stormwater infrastructure along the areas of Holly, Walnut, and Redwood roads. Project activities include digging approximately 3,000 linear feet of drainage ditches with the installation of driveway pipes and several spans of reinforced concrete pipe. Households in the project area will benefit from this project.

Contact:

Gordon Hargrove
9 E. Boiling Spring Road
Boiling Spring Lakes, 
NC 
28461 
(910) 363-0025